Login
Town of Rockland, Maine
Home
Chart
Links
State of Maine Title 38: WATERS AND NAVIGATION
USCG Float Plan
You are here:
Pre Application
>
Application Form
>
Application Completion
Instructions
Please submit this form using any of the contact methods provided below.
Instructions
Mooring permit applications are due by March 15.
Provider Name
City of Rockland, Maine
Provider Mailing Address
Harbormaster Molly Eddy
270 Pleasant St.
Rockland, Maine 04841
Provider Phone
(207) 594-0312
Provider Email
Harbor@rocklandmaine.gov
Application
Reference Number
TOIXHHHA
Application Status
Unknown
Application Type
Rental Mooring Permit
Applicant
Contact Information
Mailing Street
Mailing City
Mailing State
Mailing Zip
Primary Phone
Alternate Phone Number
Mobile Phone
Work Phone
Email Address
Additional Information
Resident?
Vessel
Reg or Doc #
Vessel Name
Vessel Usage
Vessel Type
Size
Length
feet
inches
Beam
feet
inches
Draft
feet
inches
Displacement
Characteristics
Vessel Make
Engine
Engine Type
Other
Vessel Photo(s)
(Maximum file size=10MB)
Berth
Mooring Type
Location
Location
Application Latitude/Longitude
Latitude
Degrees
Minutes
Seconds
Longitude
Degrees
Minutes
Seconds
Inspection
Service Provider
Inspection Date
Water Depth
feet
inches
Primary Tackle
Block Type
Anchor Weight
Staple Size
Bottom Chain Size
Bottom Chain Length
feet
inches
Top Chain Diameter
Top Chain Length
feet
inches
Buoy Size
Buoy Type
Pennant Diameter
Pennant Type2
Pennant Length
feet
inches
Other
Installation Date
Markings
Attachments
Attach a paper copy of each attachment listed below:
Boat Registration or USCG Documentation
Expiration Date
Proof of Residency of Rockland, Maine
Drivers License, Passport, Military Identification, Utility Bill etc.
Expiration Date
Acceptance
Terms and Conditions
30%">
I agree that this permit allows me a one year use of the location described within the confines of Rockland Harbor under authorities of the City of Rockland, Maine. I agree to maintain the mooring hardware as set forth in applicable City of Rockland ordinances. I understand that based on the changing needs of the harbor and/or for reasons of safety, the Harbor Master may reassign me to a new location at anytime in the future. Should I be reassigned for these reasons, I agree that the cost of moving my mooring shall be borne by me, that the City of Rockland shall bill me this cost and that my permit shall not be renewed until I have paid the costs of moving the mooring. I agree that in the event my mooring should move due to weather or other external force, the City of Rockland may move it back to its assigned location and will bill to me the costs associated with returning
the mooring to my permitted location.
I understand that in the event I should wish to sell the mooring hardware which I own, the sale of this hardware does not include the permitted location and that the person to whom I sell the hardware may be assigned a new location within the harbor mooring areas.
I understand that if I intend to renew my permit I will do so by paying the applicable mooring permit fees for the permit use indicated prior to March 15th of each year. If I do not renew the mooring permit prior to March 15th, a $30 late fee can be imposed. If the mooring permit is not renewed by 01 Aug of the same year, the mooring can be considered abandoned. The mooring may be moved at the owner’s expense. The owner has 30 days to claim the gear, pay the associated fees, and cost of moving the mooring. At which time, the owner may move the mooring to another approved mooring site. If the owner cannot be contacted after a reasonable effort, the City will address the abandoned property per Abandoned Mooring Policy which is in accordance with Title 25, Section 3501 et seq. of Maine Revised Statutes.
I understand that state law requires that I own a boat in order to have a mooring permit and that the boat must be placed upon the mooring each year. Proof of payment of excise tax on the boat assigned to my private mooring is attached as required. In the event that I sell my boat and wish to retain a mooring location in Rockland Harbor, I understand the limits placed on me by ordinances governing non-use of a mooring site.
A copy of this permit will be returned along with your mooring sticker and receipt
Applicant Signature (required for permit) Date
Make checks payable to the City of Rockland
Mail to: Harbor and Waterfront Department
270 Pleasant Street
Rockland, ME 04841
For rental moorings(those intended by me or my organization to be rented for a fee to other users) I acknowledge that
I have been informed of the Army Corps of Engineers permit requirement in addition to this municipal permit. I understand that it is solely my responsibility to acquire ACOE permits for those moorings I maintain for rental purposes. I also understand the requirement that I provide proof of insurance are attached.
I have read and understand the Online Mooring
User Terms and Conditions
Signature
Date
Your Ad Here...