Login
Harbor Master, Port of Portland, ME
Home
Chart
Links
Harbor Info
You are here:
Pre Application
>
Application Form
>
Application Completion
All
Instructions
Application
Applicant
Vessel
Wait List
Attachments
Acceptance
Instructions
Please complete the application, then click the "Next" button below
. For help on any field, move the mouse over the field name.
Instructions
When you submit a mooring permit application, you agree to the following. Please read carefully before proceeding:
This permit is non-transferable and is for the use of the above-named boat only, except on a temporary basis, at the discretion of the Harbor Master.
All mooring permits expire on December 31st. Renewal applications and all communications will be emailed to you via onlinemooring.com at the address you provide. Be sure to monitor your inbox and spam folders. Renewal form and fee must be received before March 15th or a higher fee will be assessed.
Moorings not re-registered by June 15th will be considered abandoned, cut loose or removed and their location reassigned unless prior arrangements have been made with the Harbor Masters office. Abandoned moorings may be sold for the cost of removal and storage.
It is illegal to rent a mooring without a federal permit.
Mooring locations will be assigned by the Harbor Master or Deputy in collaboration with your mooring inspector. The location is subject to change at any time, at the discretion of the Harbor Master or Deputy, as conditions dictate.
Holder of permit is responsible for his/her mooring and must contract with an authorized mooring inspector to make adjustments, as required, for the safety of this boat and adjacent boats.
Mooring number must be painted on mooring buoys in at least 3" letters of a contrasting color to ball.
The valid mooring registration sticker must be affixed to the boat, on the port side, following the state registration sticker.
If any boat on a mooring is taking on water, adrift, or in danger, the Harbor Master may authorize a private contractor to pump out or tow the boat at the owner’s expense. The owner must pay the contractor within 60 days or he/she will lose all mooring privileges.
No watercraft will be permitted on a mooring between November 1st and March 30th inclusive. Any watercraft may be removed from the water after November 1st, at the owner’s expense, unless prior arrangements exist with the Harbor Master for active use of this mooring.
Moorings must pass inspection every two years, by an inspector authorized by the Harbor Master, or permit will not be renewed. A current list of authorized mooring inspectors may be obtained by contacting our office. Inspection certificate must be submitted before mooring is used. Conservation moorings shall be inspected annually and comply with the Harbor Master's definition of a conservation mooring.
If you pay by check, please write the mooring number in the reference section.
Provider Name
Board of Harbor Commissioners for Portland Harbor
Provider Mailing Address
2 Portland Fish Pier
Suite 105
Portland, ME 04101
Provider Phone
207-772-8121
Provider Email
phm.admin@portlandharbor.org
Application
Reference Number
BMVNEOHK
Application Status
Unknown
Application Phase
Other Public Access
Application Type
Mooring Permit
Application Comments
Applicant
First Name
Last Name
Date Of Birth
Contact Information
Winter Street
Winter City
Winter State
Winter Zip
Use Same Address Below
Summer Street
Summer City
Summer State
Summer Zip
Home Phone (Summer)
Home Phone (Winter)
Other/Cell Phone
Work Phone
Email Address
Additional Information
Resident of Portland/So. Portland?
No
Yes
Emergency Contact Name and Phone
Vessel
Reg or Doc #
Vessel Name
Vessel Type
Power boat
Sailboat
Other
Size
Length
feet
inches
Beam
feet
inches
Draft
feet
inches
Characteristics
Vessel Make
Other
Vessel Photo(s)
(Maximum file size=10MB)
Wait List
Wait List Selection
Select up to 1 list(s):
List Name
A - Centerboard Yacht Club - CYC members only
B - Fore River (commercial moorings)
C - East End Beach
D - Willard Beach (Simonton Cove)
E - Bay Street (Dana Beach)
F - Spring Point
G - Great Diamond Island (Diamond Cove)
H - Great Diamond Island (Lamson Cove, Echo Cove,
I - Cushing Island (Spring Cove, Spicers, Summer)
J - Peaks Island (Trotts Rock to Brackett Point, H
K - Peaks Island (Brackett Point to Engineers Whf)
L - Peaks Island (Forest City Landing to City Poin
M - Peaks Island (City Point to Trefethen Landing)
N - Peaks Island (TEIA Club)
O - Peaks Island (Trefethen to Pumpkin Knob, Everg
P - Little Diamond Island (East Side)
Q - Little Diamond Island (West Side)
R - Great Diamond Island NW (Seal & Indian Coves)
S - Cliff Island (Boat Cove, Griffin Cove)
T - Cliff Island (West Side [Front])
U - Cliff Island (Northeast Cove, Promised Land)
V - B&M (MYC access only)
W - Great Diamond Island (Diamond Cove Yacht Club)
Attachments
Please provide attachments below, preferably in a PDF or image format. To convert a paper document to electronic format, take a photo of the document.
If you can't provide an electronic copy, you can submit a paper copy offline.
If we have a current copy on file, you will see a link to it. Update the attachment if it has changed, or if requested.
Boat Registration/Documentation
Not Applicable
Filename
(Maximum file size=10MB)
Expiration Date
Proof of Residence. *Only required for Portland and/or S. Portland residents
Not Applicable
Filename
(Maximum file size=10MB)
Expiration Date
Insurance
Not Applicable
Filename
(Maximum file size=10MB)
Expiration Date
Acceptance
Terms and Conditions
30%">
I have read the instructions on this application, and agree to abide by decisions of the Harbor Master and the Coastal Waters Ordinance.
I have read and understand the Online Mooring
User Terms and Conditions
I have read and accept these terms
Your Ad Here...